By accident the safety to power system, equipment and person causes operating trouble to be damaged directly, bring significant loss to people life property, cause serious political effect even, must cause height of various concerned personnel to take seriously. Fulfil now " rules of work of electric job security " in system of operation pouring dam up water (abbreviation " operation system " ) decisive issue undertakes treatise, bring into a system to change, standardization, standardization (abbreviation " 3 change " ) management, do one's best holds a key, avoid by accident the happening of operating trouble.
The custody of 1 operation pouring dam up water works
The guardian of operation pouring dam up water is the specific controller that handles the task, directorial essentially, level and working style are opposite their technology to carry out each correctly " operation system " , finish brake to handle the task, do not produce operating trouble, do not happen especially decision action reachs since operating trouble by accident.
The safe technology level of guardian must be equal or prep above handles a person, must be familiar with this system and its supervisory and control arrangement, have rigorous, meticulous work way, and when the class psychosis is normal, the mood does not suffer external cause effect. In operation pouring dam up water, every movement that guardian must handle measure of every the task, operation and operation person to every first and last has examine and verify, examination strictly, correct, affirm. Discover a problem instantly secure, report to superior, yet to be investigated clear reason or travel of the reentry after returning to normal are operated. Operate by accident to prevent to happen, to single high-pressured equipment operation, also should send guardian to undertake custody.
Annual workshop (work area) should be on duty before the basis one year personnel operation does not have accident percent of pass and expression, choose check and ratify to guardian, announce, award, summary raises operation technology level, letting faculty know custody to work is a responsibility great, already him protection, other, protect the glorious mission of safety of electrified wire netting, equipment again.
The examination of around of 2 operations pouring dam up water works
The examination that handles from beginning to end through pouring dam up water works, can discover the flaw of the influence of factitious wrong leakage, outside or equipment, person of monitor, operation, guardian should handle this work seriously, so that discover a problem in time, prevent blind direct, operation.
The examination before 2.1 operations task is carried out
Handle the task to power transmission, the monitor before carrying out should be checked first affirm concerned job ticket already ended truly, what install ground wire to already was demolished. Send a person to go next the spot (inside administrative limits) the examination concerns equipment: Without bequeath ground wire; Equipment is normal, complete, clean, linger without personnel reach the tool is sundry bequeath; Spot cleanness is orderly, illume is enough; Measure equipment insulation resistance, make good insulation record; Reexamination supervisory and control arrangement, its pressing plate casts Xiang Zheng truly. The monitor does final examination to check to supervisory and control arrangement, affirm equipment has power transmission requirement.
Previous12 Next
Be defeated become electrical engineering Cheng sends means of the experiment on
From; Author:Stand originally
- Division of garden of industry of It
- Cast of nodular cast iron of high en
- 35kV transformer substation restrict
- In what does transformer of voltage
- The installation of cable branch box
- The utility of transformer reachs cl
- Fall caustic needs those who take tr
- Electric power technology and power
- In electric couplet transmit nationa
- National electrified wire netting ho
- Transformer does not produce electro
- The way that international of indust
- Raise design level
- Voltage of short duration falls with
- Have the field test of circuitry of
- Be defeated become electrical engine
- The method that electrified exercise
- What to bring about transformer sky
- How the choose and buy is ligneous f
- Electric power technology and power
- Fall caustic needs those who take tr
- The utility of transformer reachs cl
- National electrified wire netting ho
- In electric couplet transmit nationa
- 35kV transformer substation restrict
- How the choose and buy is ligneous f
- What to bring about transformer sky
- The method that electrified exercise
- Be defeated become electrical engine
- Have the field test of circuitry of
- Voltage of short duration falls with
- Raise design level
- The way that international of indust
- Transformer does not produce electro
- The installation of cable branch box
- In what does transformer of voltage
- Cast of nodular cast iron of high en
- Division of garden of industry of It